Bicycle frames, engineered for production.

Independent product engineering and industrialization for bicycle and e-bike brands. Led by Anton Nastev, who co-founded and ran an aluminium frame factory.

  • 15+ yearsin the bicycle industry
  • 9 steps, 7 gatesconcept to serial production
  • Sofiaworking across Europe
The finished full-suspension bike, photographed in the factory
The same bike as a CAD model, before it was built

Why programmes lose time

A prototype that rides well still has to become a frame built in thousands. That is where programmes lose time.

70–80%

of a product’s cost is committed at the design stage. Changes are cheapest on the drawing.Source: Boothroyd Dewhurst, DFMA

From parts to frameset

Every tube, link and pivot of a full-suspension frame, modelled and checked before anything is cut.

CAD model of the assembled full-suspension frameset

Where the time is saved

The steps stay the same. The loops back between them go.

Requirements first

Test regime, cost and volume fixed before geometry.

Suppliers inside DFM

Suppliers review the design before they quote.

Test plan before prototype

Every sample round answers a defined question.

Long-lead tooling early

The longest-lead dies are identified at G3, before design freeze.

Quality with the process

The pilot is measured against a written standard.

Who it is for

Each programme enters the process at a different step.

Brands moving production to Europe

Re-industrialize an existing frame for a new factory.

See the steps →

E-bike, e-MTB and cargo programmes

Plan the lab test before the first sample is built.

See the steps →

Start-ups and new entrants

From sketch to series, with one accountable lead.

See the steps →

Investors and acquirers

Engineering due diligence on a frame operation.

See the steps →
Where are you now?
The process

From concept to serial production

Nine steps and seven decision gates. Most programmes join part-way through.

01

Concept & Requirements

A market idea turned into a brief engineers can build against.

G1 · Concept approved
02

Design & Architecture

Geometry and manufacturing route, decided before metal is cut.

G2 · Architecture frozen
03

Design for Manufacturing

The design adapted to the factory that will build it.

G3 · Released for prototype
04

Prototype & Validation

Lab-tested against a written plan, to EN ISO 4210 or EN 15194.

G4 · Design freeze
05 + 06 · in parallel

Industrialization

Process, tooling and suppliers, qualified before the pilot.

Quality Planning

Control plan and Q-gates, written alongside the process.

G5 · Pilot readiness
07

Pilot Series

The process proven on production tooling, at rate.

G6 · Production release
08

SOP & Ramp-up

From the first serial frame to stable full-rate output.

G7 · Handover
09

Continuous Improvement

Data from your own line drives cost and quality.

↺ · Next model year

Start at your step

Start a project
Step

From CAD to a built bike

One part followed from Anton’s own work: the CAD model, the machined rocker, the frame prototype and the bike it went into.

Suspension rocker modelled in CAD
01DesignThe suspension rocker, modelled in CAD
The machined aluminium rocker clamped in a machine vice
02PartThe same rocker, machined in aluminium
Prototype aluminium front triangle with rear shock on the build table
03PrototypeFront triangle and shock on the build table
The assembled full-suspension bike in the factory
04ProductThe rocker in the assembled bike
Full-suspension bicycle on a frame production floor

Capabilities

Twelve disciplines, built hands-on in frame development and production.

Frame engineering

Hydroforming

Tube processing

TIG welding

Heat treatment

Machining & alignment

Tooling & fixtures

Quality systems

Validation & testing

Engineering documentation

Supplier development

Cost & investment

Validation is planned to EN ISO 4210, EN 15194, EN 17404 or EN 17860, as the product requires. Accredited independent labs run the tests.

Ways to work together

Four ways in, from a short diagnostic to a long-term role.

Recommended first step

Diagnostic

Where the programme stands and what to fix first. A written report you keep.

Ask for a diagnostic →

Supplier & factory support

Audits, tryouts, pilot runs and welder training, on site.

Request support →
  • Anton leads the workNothing subcontracted without your consent.
  • Your IP stays yoursAll drawings, reports and data.
  • NDA on requestSigned before any files change hands.
  • Fixed scope and feeAgreed before work starts.
Founder

Anton Nastev

Mechanical engineer · MSc Automotive Technology, TU Eindhoven

More than fifteen years in the bicycle industry. He co-founded an aluminium frame factory near Sofia and took it from an empty hall to serial production: hydroforming, welding, heat treatment, machining and quality gates.

Career profile on LinkedIn
Anton Nastev holding an aluminium bicycle frame in a frame factory
  1. 2014–2016RAM BikesProduct development
  2. 2018–2023Cycle GetsCo-founder and CEO
  3. 2023–2026Cycle GetsCTO
  4. 2026ANVILIndependent practice

From the workshop

16 photos
  • Prototype frame laid out on the full-size drawing
  • Frame located in a welding fixture
  • TIG-welded frame junction
  • CNC machining of production tooling
  • Machining an aluminium part with coolant
  • Forging dies for an aluminium part
  • Hydroformed tubes ready for processing
  • Hydraulic press in the frame factory
  • Frames racked for heat treatment
  • Raw frames in the finishing booth
  • Frames on the production line
  • The frame factory floor
  • Machining hall
  • Hardtail frame in CAD
  • Frame geometry with key dimensions
  • Forged part modelled in CAD
Your project

All fields are required unless marked optional.

Where is the project now?

Choose where the project is now. "Not sure" is fine.

What are you working on?

Choose at least one product type.

Main challengeOptional
The details
0 / 2000

Add a few words about the project (30 characters or more).

Product and testing Optional

Sets the use category (EN 17406) and the test regime.

Frame construction

Tells Anton which tooling and processes are involved.

Target markets
Volume, timing and supply Optional

Leave empty if flexible.

What you already have

Optional. Helps size the proposal to your question.

About you

Your enquiry is confidential. Anton will sign your NDA, or send ANVIL's, before any drawings, CAD, test reports or supplier details are exchanged.

Enter your name.

Enter an email address Anton can reply to.

Not incorporated yet? Write your project name.

Enter a company or project name.

Confirm you have read the privacy notice.

Thank you. Your enquiry has arrived.

Anton will reply personally from info@antonnastev.com within two working days. If you asked for an NDA, it comes with that reply.

Your reference: ANV-000000-XXXX